Process
Listen, Design, Create

Getting to know what you want and need is the key to a successful project. We’ll discuss your ideas in detail to create an architectural brief – a plan that will develop and change as the project progresses.

​

Once we understand your goals, we move into the concept design phase. This is where we explore ideas and give you enough information to make good decisions about how to get the best from your project.

​

We follow the RIBA work stages – a step-by-step process that helps keep everything organised. This ensures everyone on the design team is on the same page and communication stays clear from start to finish; read below for a more detailed breakdown of stages.

Concrete Wall

Stage 1
Strategic Definition, Preparation & Brief

Let’s get to know each other!  This is a meet and greet at your property and learn about your wants/needs to help craft the architectural brief. 

 

From this we can discuss how Ikonic Architecture can best provide services to add value and maximise the success of your project.
 

​Steps in this stage

  • Meeting on site

  • Defining the project requirements

  • Outlining the best route to allow you to make an informed decision about your next step

Marble Surface

Stage 2
Concept Design

Bring your ideas to life by creating concept schemes; normally, three options will be produced with a follow-up meeting to discuss the design document. Clients often pick and choose between the three options to create a preferred option to progress to the next stage. ​Design analysis document with early high-level cost estimates.
​
If the project is likely to be complex planning permission, we will suggest other consultants to begin being involved, such as planning consultants and heritage experts.  
 
We will discuss the best planning route to achieve your desired result from permitted development, pre-application advice, house holder planning applications and full planning applications depending on the project requirements.
​
Steps in this stage

  • Feasibility studies

  • Proposals, specifications, and initial costing

  • Early input from planners

Stage 3
Developed Design (planning applications)

This stage refines the design, making sure the architecture works smoothly with increased levels of detail. Creating the necessary documents to support any planning applications as required.

The project will be checked to see that everything meets building regulations. The finalised package will be issued to the client for approval prior to submission to the local planning authority. 

Steps in this stage

  • Compliance with building regulations

  • Final client sign off

  • Applying for planning permission

Plastering a Wall

Stage 4 A
Technical Design (Building Regulations)

Permitted development planning route
If your project doesn't require planning permission, you can progress with the building regulations, potentially skipping formal permission.
​
Planning permission required route
It is suggested that you start work on this stage after you receive planning approval.
 
Steps in the Process:

  • Detailed technical drawings and building regulation specifications

  • Final client sign off

  • Submission to building control

Stage 4 B
Technical Design (Tender)

Once you’re happy with the design, we can create detailed drawings, specifications, and a schedule of works.

 

This information is used to get competitive bids from 3 to 4 contractors, making it easy to compare their offers.

 

We also help you find and vet the right contractors, ensuring you get the best value for your project.

 

Steps in the Process:

  • Detailed technical drawings and specifications

  • Finding the right contractor through competitive bids

Terrazzo Tiles
Urban Kitchen Cupboard

Stage 5
Construction

Depending on the chosen package, our involvement will change.

​

Construction starts and your design takes shape. We oversee the building contract, making regular site visits to ensure everything meets our high standards and matches the drawings and specifications.

​

We stay in close contact with the contractors, keeping a careful eye on progress to ensure you're only paying for work that's done to the highest quality and delivered on time.


​Steps in the Process:

  • Construction begins

  • Regular site visits to monitor progress and quality

  • Ongoing review of contractor work and payments

Stage 6
Handover

With construction complete, we carry out final inspections, address any remaining details, and provide the necessary information to hand over information to the client.

​

Steps in the Process:

  • Final inspections

  • Completion of project

Black Background

This section has outlined the process from the initial meeting to the final handover of the project; click on services to get an understanding of the different packages available.

Ikonic Architecture Logo Portrait Black
Norfolk Chambers Member Logo- transparent.png
CIAT_Emblem_Affiliate_Blue_CMYK.jpg
  • LinkedIn
  • Instagram
  • Facebook
  • Pinterest

Operating across Norfolk and Suffolk

​​Norwich, Attleborough, Diss, Dereham, Hethersett, Hingham, Wroxham, Watton, Swaffham, East Harling, Bungay, Diss, Thetford, Aylsham, Mulbarton, Harleston, Loddon, Long Stratton, Kings Lynn, Sheringham and Holt.

© 2024 by ikonic Architecture. Powered and secured by Wix

bottom of page